# Summary

> Macro (details)
> 
> | **Logo** | ![image](media://c329aa1c-9850-464c-982e-23dd2ad0ceca) |
> | --- | --- |
> | **Use Case** | Value Mapping Board |
> | **Category** | Planning |
> | **Company/Team**<br>**Managed Projects** | Both |
> | **Summary** | Magic quadrant for mapping Jira issues value / cost tradeoffs |

> 📝 The paragraphs below outlines the specific use case. For more details about advanced features and complementary functionality we suggest to review [https://releasemanagement.atlassian.net/wiki/spaces/ASPT/pages/875692462](https://releasemanagement.atlassian.net/wiki/spaces/ASPT/pages/875692462) section of this documentation.

# Topics

> Macro (toc)

# Detailed overview

## How to create?

(1) Go to “My Boards“ section. If you do not have any active boards this going to be your default page.

![image](media://51b6f336-b61a-448c-89eb-d5b2971b3a75)

Otherwise (if you already have one or few boards created) click on menu icon in top left corner to select “Manage Boards“

![image](media://6a1a79b3-2c49-4e7e-8af6-c799a0c9e061)

(2) Click on “Create board“, choose “Value Mapping Board“ and Next.

![image](media://05169355-7f59-4e2f-97d1-6efb8b5f53cb)

(3) On the initial configuration screen please specify

- **Name** of the board
- **Projects** to pool Jira issues from
- **Story points field **representing *Cost *on Value/Cost tradeoffs

> ℹ️ Depending on configuration of the Jira Project different fields could be used for Story Points, namely
> ℹ️ 
> ℹ️ - **Story Points** for “Classic“ projects
> ℹ️ - **Story point estimate** for “Next Gen“ projects
> ℹ️ 
> ℹ️ If you try to use the wrong one an appropriate error message will be shown.

- **Value field **representing *Value *on Value/Cost tradeoffs
  - if you do not have one tick the toggle below for us to use **labels** instead
- **JQL** to filter out the issues

![image](media://2725bc8f-68d4-4add-beab-93d0cd0455c2)

(4) Click “Create“

## How to use?

(1) If you toggled for us to use label for the value field you will receive a board with predefined Columns and Swimlanes as well as all applicable Jira issues in “Others“ left column at the bottom.

![image](media://677ed31c-b312-47c3-9dfd-f78a759e24b4)

If you specified the Value field used (probably one of the Custom Fields) you would need to populate few swimlanes to move the issues across. Just navigate to the space between swimlanes to add one or few

![image](media://3cda05e2-9446-4d1c-acbb-dbb1ceb0c9c6)

(2) Drag and drop issues between columns/swimlanes to assign Jira issues a) Cost in StoryPoints b) Value in the “props“ you choose. All the changes to Assignee field are applied automatically and you do not need to commit it after.

![image](media://e7bdf973-3d4a-408b-bc05-fea2f2b60d84)

(3) To **Edit** column value, **Change** title, **Add** or **Remove **one move mouse to selected column and you will receive a tooltip with all the available options:

![image](media://a79e06c5-39a0-4e12-bf35-8ee95e62bfd5)

(4) Same applies to swimlanes: - navigate your mouse to one of them to **Add**, **Edit** or **Delete**

![image](media://f5923541-abb1-4260-82d4-ad90de82eac3)

## How to configure?

(1) Click settings icon in top right corner ..

![image](media://a5d425cf-6497-47a3-9c82-f4a60d80e538)

.. to open “Board configuration“ screen.

(2) on “General” Tab you can amend

- **Name** of the board
- **Projects** to pool Jira issues from
- **JQL** to filter out the issues

![image](media://7da7866a-bf69-497c-ac49-c7e24f904402)

(3) on “Columns and Swimlanes“ tab you can change configuration of fields used respectively for Columns and Swimlanes. Swimlanes are optional. To remove them choose “-- none -- “ in popup.

![image](media://992da3da-fcaa-4984-88cb-47b972ab43d3)

> ℹ️ Depending on configuration of the Jira Project different fields could be used for Story Points, namely
> ℹ️ 
> ℹ️ - **Story Points** for “Classic“ projects
> ℹ️ - **Story point estimate** for “Next Gen“ projects
> ℹ️ 
> ℹ️ If you try to use the wrong one an appropriate error message will be shown.

> Macro (include)